Redevelopment and Acquisition of Property
Read whole topic Back Print Forward

3. Selection

The URA will consider allapplications which fulfill the selection criteria. All applications will be assessed with reference to the following factors:

Residential building conditions

For example:

  1. A high proportion of the residential buildings in poor condition, indicated by building decay and dilapidation, such as concrete spalling, cracking, bulging, leakage or seepage;

  2. A high proportions of the residential buildings with confirmed signs of sub-divided units;or

  3. Residential buildings with permanently obstructed means of escape from the ground floor to the roof.

Planning gains

For example:

  1. The redevelopment allows for set-back/road widening, etc. (ifthe Government’s intentions are known) or has the potential for this;

  2. The redevelopment allows for pavement widening/corner set-back /realignment of a public passageway;

  3. The redevelopment allows for better vista and air-ventilation;

  4. The redevelopment allows for the provision of at-grade open space, or space for social enterprise or GIC use;

  5. Buildings/structures within the proposed project are of historical, architectural or cultural significance, and are deemed to be able to add value to the future development by providing a viable”theme”;

  6. The redevelopment allows for designs to mitigate current noise impact;

  7. Existing use includes obnoxious trades, or unauthorized or illegal activities, the removal of which by way of redevelopment would have a positive impact on local living environment;or

  8. Poor living conditions: e.g. a high degree of sharing (if discernible).

Planning impact

For example:

  1. Redevelopment of the proposed site would compromise the potential of implementing a more comprehensive project for the benefit of the community;

  2. Existing use (with a distinct local character) would be removed by redevelopment; or

  3. Over-concentration of projects in that district in the same year.

Other planning factors

For example:

  1. A clear indication of local aspirations;

  2. Ownership structure;

  3. Re-housing resources in the district; or

  4. Abnormal spate of tenant evictions.

If there is/are suitable demand-led redevelopment project(s) that satisfy all the application requirements, the URA may exercise its absolute discretion, while considering whether the URA has sufficient resources to undertake any such demand-led redevelopment projects within a reasonable period.
Demand-led redevelopment projects selected by the URA have to be approved by the Financial Secretary for implementation.

The URA conducts a freezing survey for the building(s) within the site of an approved project for commencement. This indicates that the relevant application has been approved and that the relevant project has commenced.

Top